Skip to main content.

UK Research & Innovation: UKRI-2253 R80 Tower Decommissioning and Adiabatic Cooler Design and Build

  UK Research & Innovation has published this notice through Delta eSourcing

Notice Summary
Title: UKRI-2253 R80 Tower Decommissioning and Adiabatic Cooler Design and Build
Notice type: Contract Award Notice
Authority: UK Research & Innovation
Nature of contract: Works
Procedure: Open
Short Description: UKRI wishes to establish a Contract for the provision of R80 Tower Decommissioning and Adiabatic Cooler Design and Build. The estimated value of this opportunity is £1,000,000 - £2,000,000. The scope includes management and delivery of design and construction services for the R80 Chilled water and process systems at the site address Rutherford Appleton Laboratory, Harwell, Oxford, Didcot OX11 0QX. The Contractor is required to act as a design and build contractor and will be responsible for all civil, mechanical, electrical construction; installation and commissioning within the CDM Works area.
Published: 19/12/2022 10:13

View Full Notice

UK-Swindon: Installation work of cooling equipment.

Section I: Contracting Authority

   I.1) Name, Addresses and Contact Point(s):
       UK Research & Innovation
       Polaris House, North Star Avenue, Swindon, Swindon, SN2 1FL, United Kingdom
       Tel. +44 1235446553, Email: procurement@stfc.ac.uk
       Contact: STFC Procurement
       Main Address: https://www.ukri.org
       NUTS Code: UK

   I.2) Joint procurement:
      The contract involves joint procurement: No          
      In the case of joint procurement involving different countries, state applicable national procurement law: Not Provided
      The contract is awarded by a central purchasing body: No

   I.4)Type of the contracting authority:
      Body governed by public law

   I.5) Main activity:
      Other activity: Research and Innovation

Section II: Object Of The Contract

   II.1) Scope of the procurement

      II.1.1) Title: UKRI-2253 R80 Tower Decommissioning and Adiabatic Cooler Design and Build            
      Reference number: UKRI-2253

      II.1.2) Main CPV code:
         45331230 - Installation work of cooling equipment.


      II.1.3) Type of contract: WORKS

      II.1.4) Short description: UKRI wishes to establish a Contract for the provision of R80 Tower Decommissioning and Adiabatic Cooler Design and Build. The estimated value of this opportunity is £1,000,000 - £2,000,000. The scope includes management and delivery of design and construction services for the R80 Chilled water and process systems at the site address Rutherford Appleton Laboratory, Harwell, Oxford, Didcot OX11 0QX. The Contractor is required to act as a design and build contractor and will be responsible for all civil, mechanical, electrical construction; installation and commissioning within the CDM Works area.

      II.1.6) Information about lots
         This contract is divided into lots: No
            
      II.1.7) Total value of the procurement (excluding VAT)
          Value: 1,507,366
                  
         Currency:GBP            

   II.2) Description

      II.2.2) Additional CPV code(s):
            42500000 - Cooling and ventilation equipment.


      II.2.3) Place of performance
      Nuts code:
      UK - UNITED KINGDOM
   
      Main site or place of performance:
      UNITED KINGDOM
             

      II.2.4) Description of the procurement: The Contractor is required to act as a design and build contractor and will be responsible for all civil, mechanical, electrical construction; installation and commissioning of the following – but not limited to - within the CDM Works area (i.e., The R80 roof area) and in accordance with the Completion Dates (See Provisional Programme within Appendix D - Project Brief). - 8 No New Adiabatic coolers (AC’s). - Connecting pipework and fittings to and the new AC’s within the CDM Works Area. - All types of valves (isolation, regulating, non-return either manual or actuated). - Commissioning sets and pressure reducing valves. - Testing and drainage points. - Basket and other Filters. - All steel support work for the Adiabatic Coolers. - All pipework supports. - All local electrical power and signal cabling with cable trays etc and supports. - All necessary civil surveying /setting out work. The Contractor will be entirely responsible for organising the decommissioning and removal of the existing Balticare Cooling Towers within the CDM Works Area. Background The ISIS Neutron and Muon Source is a world-leading centre for research at the STFC Rutherford Appleton Laboratory near Oxford. The R80 facility houses the Second Target Station (TS2) and its associated neutron beamlines. At the end of each beam line is an instrument hut complete with research instrumentation all of which require a source of suitably graded cold demineralised water. The Demin cooling water used to cool the target is provided by a ‘closed loop’ circuit with the duty/standby pump arrangement; two Plate Heat Exchangers (PHExs) and associated controls situated within the Level 2 West Plant Area T222. Likewise, the instrument water is fed from a similar set up situated within the Level 2 West Plant Area T220 on the same storey. A source of cooling is also necessary for the focusing magnets and associated power supplies along the main proton beamline that leads to TS2 - known as the Extract Proton Beamline 2 or EPB2. The R6 Plant link room – situated in the corridor that links the R6 facility to R80 – houses the EPB2 Magnet Demin cooling water system and a separate power supplies Demin circuit. All the above ‘closed loop’ water circuits contain a ‘coarse’ grade cooling PHEx that uses the process water (PW) and a PHEx fed with chilled water (CHW) used to ‘trim’ each circuit Demin to the required Semin water supply temperature. Currently the process water circuit is a ‘closed circuit’ system comprising of 5 No Balticare (BAC) VX1-180-4+XB towers each rated at 800 kW. These towers are located on the R80 4th floor roof. Adjacent to the roof area leading to the first two towers is the R80 Chilled Water Plant room (Level 4 West plant room T410) which houses both the duty/standby process water pumps and 3 No TRANE 850 kW R134a charged RTHD C2 D5 E4 Chillers which are water cooled using the PW. Flow is maintained through the packaged chillers and primary loop header system by duty/standby chilled water pumps located within the Level 2 West plan room T222 together with the target circuit. Besides providing cooling to the different CHW PHExs mentioned above the chilled water system also provides substantial space cooling via Fan Coil Units (FCUs) situated in the R80 office; laboratories; server and control rooms. The water circuits were originally designed and installed by HADEN-YOUNG during the original construction phase of the R80 facility in 2006.

      II.2.5) Award criteria:
       Not Provided

      II.2.11) Information about options
         Options: No
         

      II.2.13) Information about European Union funds
         The procurement is related to a project and/or programme financed by European Union funds: No
         

      II.2.14) Additional information: Additional information: We strongly recommend that you attend the Site Tour in order to gain complete clarity of our requirements. Please follow the instructions within the ITT.


Section IV: Procedure

IV.1) Description

   IV.1.1)Type of procedure: Open


   IV.1.3) Information about a framework agreement or a dynamic purchasing system
      The procurement involves the establishment of a framework agreement: No       
      

   IV.1.6) Information about electronic auction
      An electronic auction has been used: No

   IV.1.8) Information about the Government Procurement Agreement (GPA)
      The procurement is covered by the Government Procurement Agreement: Yes

IV.2) Administrative information

   IV.2.1) Previous publication concerning this procedure
       Notice number in the OJEU: 2022/S 000-022510
      
   

   IV.2.9) Information about termination of call for competition in the form of a prior information notice
      The contracting authority will not award any further contracts based on the above prior information notice: No

Section V: Award of contract

Award Of Contract (No.1)

   Contract No: UKRI-2253    
   Lot Number: Not Provided    
   Title: UKRI-2253 R80 Tower Decommissioning and Adiabatic Cooler Design and Build

   A contract/lot is awarded: Yes


   V.2) Award of contract

      V.2.1) Date of conclusion of the contract: 14/12/2022

      V.2.2) Information about tenders
         Number of tenders received: 5
         Number of tenders received from SMEs: Not Provided          
         Number of tenders received from tenderers from other EU Member States: Not Provided          
         Number of tenders received from tenderers from non-EU Member States: Not Provided          
         Number of tenders received by electronic means: Not Provided

      V.2.3) Name and address of the contractor

      The contract has been awarded to a group of economic operators: No
         
         Contractor (No.1)
             Vistech Cooling Systems Ltd, 04808079
             Vistech Cooling Systems Ltd,, Unit 1 A, Church Lane Estate, Church Lane,, Horsham, RH13 6LU, United Kingdom
             NUTS Code: UK
            The contractor is an SME: Yes

      V.2.4) Information on value of the contract/lot (excluding VAT)
         Initial estimated total value of the contract/lot: Not Provided          
         Total value of the contract/lot: 1,507,366
         Currency: GBP

      V.2.5) Information about subcontracting
         The contract is likely to be subcontracted: No
         
Section VI: Complementary information

   VI.3) Additional information: The contracting authority considers that this contract may be suitable for economic operators that are small or medium enterprises (SMEs). However, any selection of tenderers will be based solely on the criteria set out for the procurement.
To view this notice, please click here:
https://ukri.delta-esourcing.com/delta/viewNotice.html?noticeId=745369639

   VI.4) Procedures for review

      VI.4.1) Review body
          UK Research and Innovation
          Swindon, United Kingdom

      VI.4.3) Review procedure
         Precise information on deadline(s) for review procedures: Not Provided

      VI.4.4) Service from which information about the review procedure may be obtained
         Not Provided

   VI.5) Date of dispatch of this notice: 19/12/2022




View any Notice Addenda

View Award Notice